Glass annealing lehr controls retrofit — 18% less gas, +6% yield
Burner control and thermal-profile retrofit on a specialty glass annealing lehr.
- Client
- Confidential — Specialty Glass Maker
- Location
- West Virginia, USA
- Capabilities
- Retrofit & Upgrades · Service & Support
The challenge
30-year-old lehr ran on pneumatic burner control with manual setpoints, drifting thermal profile, and a 12% breakage rate after annealing. Energy costs were rising and the plant lacked engineers who could tune the existing controls.
What we built
Replaced pneumatic burner controls with Honeywell ControlEdge PLC + ThermoPro burner management, added 32 thermocouples for a continuous thermal map, and stood up a recipe HMI tied to the glass type. Phased the cutover so the lehr never went cold.
Key equipment
- Honeywell ControlEdge PLC
- ThermoPro burner management
- Type K thermocouples ×32
- Ignition SCADA dashboard
From the floor
Illustrative image — representative of project scope; customer-identifying details have been removed.



Results
Gas use down 18%, post-anneal breakage down to 6%, and the plant gained the operator-facing HMI it never had to tune the lehr without external help.
See all 20 projects
Building Products•2024Cabinet shop modernization — lot size of 1, +45% throughput
Nest-based CNC routing, edgebanding, and robotic hardware insertion turned a batch shop into a lot-size-of-1 operation.
+45%Throughput-30%Scrap rate1 of 1Economic lot size
Building Products•2025Modular home wall-panel line — 1 panel every 9 minutes
Framing jig with auto-nailing gantry and a sheathing gantry for wood-framed wall panels.
1 panel / 9 minPer panel3 crews → 1Crew per houseOSB + 2xScope
Food & Beverage•2025Dairy bottling line retrofit — 18% throughput, 62% fewer rejects
Replaced a 1998-era controls stack with modern PLC + vision while keeping the existing filler and capper steel.
+18%Throughput-62%Reject rate11 wkProject lead time